7/17/2018 Longish Update
Last weekend, we took a trip to Red Oak and picked up the majority of Stage 3 for our kit - a couple pieces remain but we will be busy until they come in! It was great visiting with Lonny & Adam - such a wealth of knowledge there!
We put on all of the brake lines and brake reservoir (had to relocate the ground to another hole in the pedal box).
Kick plate installed. Front brake lines installed - still waiting on the aluminum spacers to arrive for attaching the brake lines to the control arms.
Steering column mostly installed. Need some tweaking on location/rotation of turn signal before final torquing of the bolts.
Intake system installed. PCV filter installed rather than vacuum cap. Struts mounted with dust covers on both sides. With all of these, we decided to run the engine again to see if it was better than before and oh yeah baby! Single crank to start and runs well and smooth now! Kept running til the radiator fan came on at 215F coolant temp. It did seem a bit slow to react from idle on an aggressive acceleration pedal push - instantly hear the air vacuum and then the rpm's revving up. Will have to try it out on the road when the time comes
Now we have it raised up to make it a bit easier for fitting the body panels on and various other electrical work. Temp sensor, light sensor, headlights, tail lights, transfer buttons from steering wheel to TBD in the Goblin, etc. Waiting on seats and straps as they are being shipped from Corbeau.
We can't seem to figure out what this black collar around the steering column is? Doesn't seem to affect operation - and it has a connector that is missing and I don't remember what I took out from the harness here. Possibly something to do with ABS?