Hey all, I'm finally getting started on my build and I figured I'd share it here to help keep me on track.
My main uses will be track days and autocross. This will replace my current car for these things (2014 Camaro SS, so this should be an infinite improvement)
Donor
I spotted a good deal on a donor on Facebook Marketplace last June for a 2007 Cobalt SS/SC. He was having issues with the ABS and AC he couldn't get cleared up and wanted it gone. Bought it, towed it home, stuck it in the garage and put it on the to-do list. It's pretty high mileage at 285k, so I figure the engine will probably need some refresh work, but it runs and drives well. ABS and AC issues obviously don't matter for this, so no concerns there.
Timeline so far
Ordered my kit in July, and discussing it with DF, we decided to take a little longer to get the large stage 3 items ready also so I could pick them all up at once.
Life gets in the way and kept me in a holding pattern until beginning of this month, when I started the process of stripping it down, and finally got out to Red Oak to collect the Phase 1 and Phase 3 parts.
The chassis is currently at Diamond Powder Coating in Austin, estimate came in at $1500, should be getting it back next week some time.
Tearing down the donor has proven pretty easy so far (the videos and this forum are a massive help), but I'm sure I'm going to find harder steps ahead. Hoping to get the subframe dropped and the powertrain out this week.
I'll try to stay diligent updating this when I make any progress.
-John
Donor still mostly intact

Donor as of 2/24/25

Chassis fits well enough in a 5x9 UHaul Trailer

Dropping it off for powder coating

My main uses will be track days and autocross. This will replace my current car for these things (2014 Camaro SS, so this should be an infinite improvement)
Donor
I spotted a good deal on a donor on Facebook Marketplace last June for a 2007 Cobalt SS/SC. He was having issues with the ABS and AC he couldn't get cleared up and wanted it gone. Bought it, towed it home, stuck it in the garage and put it on the to-do list. It's pretty high mileage at 285k, so I figure the engine will probably need some refresh work, but it runs and drives well. ABS and AC issues obviously don't matter for this, so no concerns there.
Timeline so far
Ordered my kit in July, and discussing it with DF, we decided to take a little longer to get the large stage 3 items ready also so I could pick them all up at once.
Life gets in the way and kept me in a holding pattern until beginning of this month, when I started the process of stripping it down, and finally got out to Red Oak to collect the Phase 1 and Phase 3 parts.
The chassis is currently at Diamond Powder Coating in Austin, estimate came in at $1500, should be getting it back next week some time.
Tearing down the donor has proven pretty easy so far (the videos and this forum are a massive help), but I'm sure I'm going to find harder steps ahead. Hoping to get the subframe dropped and the powertrain out this week.
I'll try to stay diligent updating this when I make any progress.
-John
Donor still mostly intact

Donor as of 2/24/25

Chassis fits well enough in a 5x9 UHaul Trailer

Dropping it off for powder coating